Switching fossil fuel from coal to LNG based natural gas in H&R Johnson (India), Kunigal for tile manufacturing process
[]
Host party(ies) India
Methodology(ies) AMS-III.AN. ver. 2
Standardised Baselines N/A
Estimated annual reductions* 7,453
Start date of first crediting period. 01 Jun 12
Length of first crediting period. 10 years
DOE/AE TÜV NORD CERT GmbH
Period for comments 19 Jan 12 - 17 Feb 12
PP(s) for which DOE have a contractual obligation H.&R. Johnson (India)
The operational/applicant entity working on this project has decided to make the Project Design Document (PDD) publicly available directly on the UNFCCC CDM website.
PDD PDD (577 KB)
Local stakeholder consultation report: N/A
Impact assessment summary: N/A
Submission of comments to the DOE/AE Compilation of submitted inputs:
1. The project owner should be kind enough, so as not to use the abbreviations like  indirect HAG.

2. The section "A.4. Technical Description of the small scale project activity" seems to just include the flow process of the LNG. Hardly any "Technical Description" has been provided. The PDD lacks description of how the gas is utilised!

If I am not wrong, the Project Owner is supposed to write technical details of the project. I am not sure what would a project owner write in this section for a wind project "blowing of the wind"??

3. The project boundary is missing from the PDD!!!

4. The additionallity does not show how much LNG & LPG would be required in comparison to the Coal and Coal Powder.

5. Quantity and Cost of the Fuels should be considered to check the viability not only the quality. LPG and LNG are cheaper compared to Coal and hence makes a good decision for the Company. It is not only a viable project, but profitable one. Operationally, LPG and LNG based units are 6 times more profitable than a Coal based plant. 

6. Efficiency of a LPG & LNG unit is always better than a Coal based unit.

7.  The Organizational Structure in the PDD is also not clear.

The PDD should be uploaded again, as it has been uploaded without furnishing the entire requirements of the UNFCCC.
Submitted by: Sandy


The comment period is over.
* Emission reductions in metric tonnes of CO2 equivalent per annum that are based on the estimates provided by the project participants in unvalidated PDDs