Wind energy project in Theni, Tamil Nadu
[]
Host party(ies) India
Methodology(ies) AMS-I.D. ver. 17
Standardised Baselines N/A
Estimated annual reductions* 21,565
Start date of first crediting period. 30 Apr 12
Length of first crediting period. 10 years
DOE/AE LRQA Ltd
Period for comments 08 Nov 11 - 07 Dec 11
PP(s) for which DOE have a contractual obligation M/s TVS Wind Energy Limited
The operational/applicant entity working on this project has decided to make the Project Design Document (PDD) publicly available directly on the UNFCCC CDM website.
PDD PDD (864 KB)
Local stakeholder consultation report: N/A
Impact assessment summary: N/A
Submission of comments to the DOE/AE Compilation of submitted inputs:
In case the PP is or will be availing REC benefits, how will this be accounted in financial calculations? Wont it make the project economically attractive?

Key parameters such as project cost are not included in the PDD for Global stakeholders to see. Why? DOE did not check the PDD prior to web-hosting?
Submitted by: Babloo

1. PDD does not mention about the total cost of project, equity component and loan component.
2. The IT depreciation is 7.86%. Whether the PPs have applied for Generation Based Incentive (GBI? If so whether the same has been considered for IRR workings?
3. What is the selling price of electricity to various parties mentined in PDD? It is not mentioned in the parameters.
Submitted by: S B


The comment period is over.
* Emission reductions in metric tonnes of CO2 equivalent per annum that are based on the estimates provided by the project participants in unvalidated PDDs