10MW Photovoltaic Plant in Dubai, United Arabic Emirates
[]
Host party(ies) United Arab Emirates
Methodology(ies) AMS-I.D. ver. 17
Standardised Baselines N/A
Estimated annual reductions* 8,115
Start date of first crediting period. 01 Mar 12
Length of first crediting period. 7 years
DOE/AE AENOR INTERNACIONAL, S.A.U.
Period for comments 24 Sep 11 - 23 Oct 11
PP(s) for which DOE have a contractual obligation Dubai Electricity and Water Authority (DEWA)
The operational/applicant entity working on this project has decided to make the Project Design Document (PDD) publicly available directly on the UNFCCC CDM website.
PDD PDD (780 KB)
Local stakeholder consultation report: N/A
Impact assessment summary: N/A
Submission of comments to the DOE/AE Compilation of submitted inputs:
The published PDD does not contain Annex 3 with the DEWA grid EF calculation.  The value used is quite different from the grid EF for the Abu Dhabi grid and I would like to study why this is so.
If possible, I would appreciate if the DOE could send me the Annex 3 spreadsheets (trgram@compuserve.com).
Thank you for your kind attention.
Submitted by: Thomas Grammig


The comment period is over.
* Emission reductions in metric tonnes of CO2 equivalent per annum that are based on the estimates provided by the project participants in unvalidated PDDs