Avoidance of methane from biomass decay by up gradation and capacity enhancement of the existing Municipal Solid Waste (MSW) composting plant in Shillong, Meghalaya
[]
Host party(ies) India
Methodology(ies) AMS-III.F. ver. 8
Standardised Baselines N/A
Estimated annual reductions* 30,125
Start date of first crediting period. 01 Jan 11
Length of first crediting period. 10 years
DOE/AE TÜV NORD CERT GmbH
Period for comments 15 Jun 10 - 14 Jul 10
PP(s) for which DOE have a contractual obligation Anderson Biotech Private Limited
The operational/applicant entity working on this project has decided to make the Project Design Document (PDD) publicly available directly on the UNFCCC CDM website.
PDD PDD (1081 KB)
Local stakeholder consultation report: N/A
Impact assessment summary: N/A
Submission of comments to the DOE/AE Compilation of submitted inputs:
Comment (20 KB) submitted by: Ragesh Jasmine on behalf of Ragesh Jasmine

1. What is the actual motive of project developer? Is it to do an as usual business (with profit) or to become a contributor to cause of GHG reduction?
  
a) PP is claiming that the project activity results improve the capacity of poor farmer to afford compost and in other hand they are getting market resistance due to the “costliest” final product. 

b) How the rag pickers and their livelihood have been protected by the project activity. Proponent need to justify its contribution towards it. 

c) What diseases PDD is claiming that the project will eradicate?

d) In one hand PDD is claiming the project as “Sustainable Waste Management” activity and in other it is showing the “List of composting plants operated in India with the reasons for closure/ running on loss”. How does the project developer ensure that the project is sustainable?

2. How technological barrier mentioned in the PDD, can prevent an investor in investing this project?

3. Under section B.5, it is again and again mentioned that "EB Gudiance on Investment Analysis" has been followed. Which guidance PDD is referring and how the investment barrier mentioned has an effect on the loan part of the project. Was this barriers made a financial institute not to sanction loan for the project? How CDM revenue is eradicating these barriers?
Submitted by: Ragesh Jasmine


The comment period is over.
* Emission reductions in metric tonnes of CO2 equivalent per annum that are based on the estimates provided by the project participants in unvalidated PDDs