Guizhou Suofenying Hydropower Project
[]
Host party(ies) China
Methodology(ies) ACM0002 ver. 13
Standardised Baselines N/A
Estimated annual reductions* 1,335,350
Start date of first crediting period. 01 Jan 13
Length of first crediting period. 7 years
DOE/AE Korean Foundation for Quality
Period for comments 27 Jun 12 - 26 Jul 12
PP(s) for which DOE have a contractual obligation Guizhou Wujiang Hydropower Development Co., Ltd.
The operational/applicant entity working on this project has decided to make the Project Design Document (PDD) publicly available directly on the UNFCCC CDM website.
PDD PDD (735 KB)
Local stakeholder consultation report: N/A
Impact assessment summary: N/A
Submission of comments to the DOE/AE Compilation of submitted inputs:
It is impossible that this project is a CDM Project.
In china, there are several hydropower plants groups planed by the government, which can provide large and stable power supply to the grid, and can be the very crucial support and foundation of the power grid. This kind of hydropower plants are built or to be built have the purpose of supporting the grid and meet the power need.
Refer to the following page:
http://course.tju.edu.cn/shuitu/xzzq/zgssdsdjd.pdf
the project locates in wujiang hydropower stations group and is impossible to be implemented after CDM consideration.
Submitted by: pure_cdm


The comment period is over.
* Emission reductions in metric tonnes of CO2 equivalent per annum that are based on the estimates provided by the project participants in unvalidated PDDs