Production of Autoclaved Aerated Concrete blocks, a cleaner and less GHG intensive walling material
[]
Host party(ies) India
Methodology(ies) AMS-III.Z. ver. 6
Standardised Baselines N/A
Estimated annual reductions* 29,736
Proposed start date of PA 12 Mar 14
Start date of first crediting period. 01 Jan 16
Length of first crediting period. 10 years
DOE/AE Earthood Services Private Limited
Period for comments 31 Jul 15 - 29 Aug 15 (23:59:59 GMT)
PP(s) for which DOE have a contractual obligation Dlite Blocks Private Limited
The operational/applicant entity working on this project has decided to make the Project Design Document (PDD) publicly available directly on the UNFCCC CDM website.
PDD PDD (1354 KB)
Local stakeholder consultation report: N/A
Impact assessment summary: N/A
Submission of comments to the DOE/AE
The comment period is over.
No comments received.
* Emission reductions in metric tonnes of CO2 equivalent per annum that are based on the estimates provided by the project participants in unvalidated PDDs