N2O and NOX Abatement Project at Delta-ASMEDA Fertilizer Plant in Al Mansoura (Egypt)
[]
Host party(ies) Egypt
Methodology(ies) AM0028 ver. 5
Standardised Baselines N/A
Estimated annual reductions* 176,132
Start date of first crediting period. 01 Jan 13
Length of first crediting period. 7 years
DOE/AE TÜV NORD CERT GmbH
Period for comments 30 Jul 12 - 28 Aug 12
PP(s) for which DOE have a contractual obligation First Climate (Switzerland) AG
The operational/applicant entity working on this project has decided to make the Project Design Document (PDD) publicly available directly on the UNFCCC CDM website.
PDD PDD (1157 KB)
Local stakeholder consultation report: N/A
Impact assessment summary: N/A
Submission of comments to the DOE/AE Compilation of submitted inputs:
Dear Madam or Sir,
as the interface was dysfunctional (i.e. not allowing to upload pdf-documents), we will send our comment to this proposed CDM project activity to the UNFCCC Secretariat by mail.
Kind regards,
Christopher Brandt
(Executive Director, Climate Concept Foundation)
Submitted by: Christopher Brandt

Comment (98 KB) submitted by: Sergey Firsov on behalf of Christopher Brandt


The comment period is over.
* Emission reductions in metric tonnes of CO2 equivalent per annum that are based on the estimates provided by the project participants in unvalidated PDDs