Shandong Zaozhuang 15MW waste heat recovery for electricity generation project (I)
[]
Host party(ies) China
Methodology(ies) ACM0004 ver. 2
ACM0002 ver. 6
Standardised Baselines N/A
Estimated annual reductions* 88,135
Start date of first crediting period. 01 Jan 08
Length of first crediting period. 10 years
DOE/AE JCI
Period for comments 30 Jun 07 - 29 Jul 07
* Emission reductions in metric tonnes of CO2 equivalent per annum that are based on the estimates provided by the project participants in unvalidated PDDs

The content you see inside this frame is located outside the UNFCCC CDM Website. If you have problems viewing the content in the frame, click here to access the web site directly.
   
UNFCCC Secretariat assumes no responsibility for the third-party content linked through its website