Hagita POME Methane Avoidance project_NBPOL-P2
[]
Host party(ies) Papua New Guinea
Methodology(ies) AMS-III.H. ver. 16
AMS-I.D. ver. 17
AMS-I.A. ver. 14
Standardised Baselines N/A
Estimated annual reductions* 58,224
Start date of first crediting period. 01 Jul 14
Length of first crediting period. 10 years
DOE/AE TÜV NORD CERT GmbH
Period for comments 14 Feb 12 - 14 Mar 12
PP(s) for which DOE have a contractual obligation New Britain Palm Oil Limited
The operational/applicant entity working on this project has decided to make the Project Design Document (PDD) publicly available directly on the UNFCCC CDM website.
PDD PDD (2605 KB)
Local stakeholder consultation report: N/A
Impact assessment summary: N/A
Submission of comments to the DOE/AE Compilation of submitted inputs:
Comments are same as for the Sangara POME MBPOL-P2 PDD, regarding the measurement campaign and remvoal efficiency used of 99.6% referring to Table B.4.b in the PDD, but no Table B.4.b exists in the PDD
Submitted by: gerald hamaliuk


The comment period is over.
* Emission reductions in metric tonnes of CO2 equivalent per annum that are based on the estimates provided by the project participants in unvalidated PDDs