24 MW Wind Energy based Power Generation In Theni, Tamil Nadu
[]
Host party(ies) India
Methodology(ies) ACM0002 ver. 13
Standardised Baselines N/A
Estimated annual reductions* 48,089
Start date of first crediting period. 31 Dec 12
Length of first crediting period. 10 years
DOE/AE SGS-UKL
Period for comments 29 Nov 12 - 28 Dec 12
PP(s) for which DOE have a contractual obligation Green Infra Wind Power Projects Limited (GIWPPL)
The operational/applicant entity working on this project has decided to make the Project Design Document (PDD) publicly available directly on the UNFCCC CDM website.
PDD PDD (570 KB)
Local stakeholder consultation report: N/A
Impact assessment summary: N/A
Submission of comments to the DOE/AE Compilation of submitted inputs:

The comment period is over.
* Emission reductions in metric tonnes of CO2 equivalent per annum that are based on the estimates provided by the project participants in unvalidated PDDs