Reduction in clinker usage in the production of cement through the increase in the use of additives at Lafarge Malayan Cement Berhad (LMCB)
[]
Host party(ies) Malaysia
Methodology(ies) ACM0005 ver. 3
Standardised Baselines N/A
Estimated annual reductions* 552,545
Start date of first crediting period. 01 Apr 07
Length of first crediting period. 7 years
DOE/AE DNV-CUK
Period for comments 08 Mar 07 - 06 Apr 07
* Emission reductions in metric tonnes of CO2 equivalent per annum that are based on the estimates provided by the project participants in unvalidated PDDs

The content you see inside this frame is located outside the UNFCCC CDM Website. If you have problems viewing the content in the frame, click here to access the web site directly.
   
UNFCCC Secretariat assumes no responsibility for the third-party content linked through its website