Mariposas Hydroelectric Project
[]
Host party(ies) Chile
Methodology(ies) AM0026 ver. 3
Standardised Baselines N/A
Estimated annual reductions* 19,200
Start date of first crediting period. 01 Sep 10
Length of first crediting period. 7 years
DOE/AE DNV-CUK
Period for comments 08 Apr 10 - 07 May 10
PP(s) for which DOE have a contractual obligation Hidroeléctrica Río Lircay S.A.
The operational/applicant entity working on this project has decided to make the Project Design Document (PDD) publicly available directly on the UNFCCC CDM website.
PDD PDD (1430 KB)
Local stakeholder consultation report: N/A
Impact assessment summary: N/A
Submission of comments to the DOE/AE
The comment period is over.
No comments received.
* Emission reductions in metric tonnes of CO2 equivalent per annum that are based on the estimates provided by the project participants in unvalidated PDDs