“5 MW Brahm Ganga Hydro – Electric Project” at Kullu district of Himachal Pradesh State, India, by M/s Harisons Hydel Construction Company Private Limited (HHCCPL)
[]
Host party(ies) India
Methodology(ies) AMS-I.D. ver. 13
Standardised Baselines N/A
Estimated annual reductions* 26,212
Start date of first crediting period. 01 Jan 09
Length of first crediting period. 10 years
DOE/AE TÜV SÜD South Asia Private Limited
Period for comments 08 Aug 08 - 06 Sep 08
* Emission reductions in metric tonnes of CO2 equivalent per annum that are based on the estimates provided by the project participants in unvalidated PDDs

The content you see inside this frame is located outside the UNFCCC CDM Website. If you have problems viewing the content in the frame, click here to access the web site directly.
   
UNFCCC Secretariat assumes no responsibility for the third-party content linked through its website