Methane Recovery in wastewater treatment system at Shree Rishabh Papers, Banah
[]
Host party(ies) India
Methodology(ies) AMS-III.H. ver. 14
Standardised Baselines N/A
Estimated annual reductions* 7,491
Start date of first crediting period. 01 Jul 10
Length of first crediting period. 10 years
DOE/AE Germanischer
Period for comments 10 Apr 10 - 09 May 10
PP(s) for which DOE have a contractual obligation Shreyans Industries Limited
The operational/applicant entity working on this project has decided to make the Project Design Document (PDD) publicly available directly on the UNFCCC CDM website.
PDD PDD (472 KB)
Local stakeholder consultation report: N/A
Impact assessment summary: N/A
Submission of comments to the DOE/AE Compilation of submitted inputs:
DOE is requested to consider the following comments:

1. DOE is requested to check the consents to operate so as to ascertain the implementation of UASB technology for methane capture is not a mandatory requirement.

Request you to please send the response/evaluation of my comment on my mail id: clean.development.mechanism.india@gmail.com

Author wishes to remain anonymous.

Regards
Submitted by: CDM INDIA

The said type of methane recovery projects are not additional at all and are part of the baseline scenario.

We are requested to DOE to check the CREP guidelines on waste water treatment (http://www.cpcb.nic.in/crep.php) and the impact of such guidelines in waste water utilization projects. Here it is clearly mention that Biogas generation and use is mandatory for all the ETP and CETP. 

      
Kindly review whether the project falls under an E+ or E- policy. For this you may also consider going through the recent EB clarification on a similar waste water treatment project. 

We are requesting to the DOE to forward the reply of the clarifications to our forum common mail address (climate.change1997@gmail.com).
Submitted by: Climate Change Forum


The comment period is over.
* Emission reductions in metric tonnes of CO2 equivalent per annum that are based on the estimates provided by the project participants in unvalidated PDDs