Lushi Yajiuhe 4.8MW Hydropower Project
[]
Host party(ies) China
Methodology(ies) AMS-I.D. ver. 17
Standardised Baselines N/A
Estimated annual reductions* 17,081
Start date of first crediting period. 01 Dec 12
Length of first crediting period. 7 years
DOE/AE JCI
Period for comments 26 Jan 12 - 24 Feb 12
PP(s) for which DOE have a contractual obligation Climate Bridge Ltd. 
The operational/applicant entity working on this project has decided to make the Project Design Document (PDD) publicly available directly on the UNFCCC CDM website.
PDD PDD (952 KB)
Local stakeholder consultation report: N/A
Impact assessment summary: N/A
Submission of comments to the DOE/AE Compilation of submitted inputs:

The comment period is over.
* Emission reductions in metric tonnes of CO2 equivalent per annum that are based on the estimates provided by the project participants in unvalidated PDDs