Datang Hami 20MW Solar PV Grid-Connected Power Generation Phase One Project
[]
Host party(ies) China
Methodology(ies) ACM0002 ver. 13
Standardised Baselines N/A
Estimated annual reductions* 29,744
Start date of first crediting period. 01 Jun 13
Length of first crediting period. 7 years
DOE/AE ReConsultCert
Period for comments 11 Oct 12 - 09 Nov 12
PP(s) for which DOE have a contractual obligation DaTang Xinjiang Power Generation Co,.Ltd.
The operational/applicant entity working on this project has decided to make the Project Design Document (PDD) publicly available directly on the UNFCCC CDM website.
PDD PDD (571 KB)
Local stakeholder consultation report: N/A
Impact assessment summary: N/A
Submission of comments to the DOE/AE
The comment period is over.
No comments received.
* Emission reductions in metric tonnes of CO2 equivalent per annum that are based on the estimates provided by the project participants in unvalidated PDDs