11.4 MW Bundled Small Hydropower Project in Shanjunyan and Liaoli, Guizhou Province, P. R. China.
[]
Host party(ies) China
Methodology(ies) AMS-I.D. ver. 15
Standardised Baselines N/A
Estimated annual reductions* 35,550
Start date of first crediting period. 01 May 10
Length of first crediting period. 7 years
DOE/AE JACO
Period for comments 09 Dec 09 - 07 Jan 10
PP(s) for which DOE have a contractual obligation Smart Energy Co., Ltd.
The operational/applicant entity working on this project has decided to make the Project Design Document (PDD) publicly available directly on the UNFCCC CDM website.
PDD PDD (1498 KB)
Local stakeholder consultation report: N/A
Impact assessment summary: N/A
Submission of comments to the DOE/AE
The comment period is over.
* Emission reductions in metric tonnes of CO2 equivalent per annum that are based on the estimates provided by the project participants in unvalidated PDDs