Marrakesh Wastewater Treatment Plant (WWTP) with biogas recovery for cogeneration
[]
Host party(ies) Morocco
Methodology(ies) AM0080
Standardised Baselines N/A
Estimated annual reductions* 123,181
Start date of first crediting period. 01 Jul 11
Length of first crediting period. 10 years
DOE/AE Bureau Veritas India Pvt. Ltd.
Period for comments 09 Sep 10 - 08 Oct 10
PP(s) for which DOE have a contractual obligation Régie Autonome de Distribution de l'Eau et de l'Electricité de Marrakesh (RADEEMA)
The operational/applicant entity working on this project has decided to make the Project Design Document (PDD) publicly available directly on the UNFCCC CDM website.
PDD PDD (1952 KB)
Local stakeholder consultation report: N/A
Impact assessment summary: N/A
Submission of comments to the DOE/AE
The comment period is over.
No comments received.
* Emission reductions in metric tonnes of CO2 equivalent per annum that are based on the estimates provided by the project participants in unvalidated PDDs