Introduction of a new Gas Turbine based combined heat and power (CHP) plant with Natural Gas fuel, in existing CHP facilities with grid connectivity at fertilizer complex of KRIBHCO at Hazira in the state of Gujarat of India
[]
Host party(ies) India
Methodology(ies) AM0099
Standardised Baselines N/A
Estimated annual reductions* 252,458
Start date of first crediting period. 01 Jun 13
Length of first crediting period. 10 years
DOE/AE Bureau Veritas India Pvt. Ltd.
Period for comments 20 Feb 13 - 21 Mar 13
PP(s) for which DOE have a contractual obligation Krishak Bharati Cooperative Limited
The operational/applicant entity working on this project has decided to make the Project Design Document (PDD) publicly available directly on the UNFCCC CDM website.
PDD PDD (1243 KB)
Local stakeholder consultation report: N/A
Impact assessment summary: N/A
Submission of comments to the DOE/AE Compilation of submitted inputs:
o	Please explain additionality criteria in detail.
o	How many skilled/unskilled people from surrounding area were employed at this project during commissioning and operation as mentioned in social well being section? Also how many houses can get benefited from total 35 MW of electricity being outsourced to state grid due to this CDM project?
o	List of stakeholders and minutes of stakeholder meeting is not attached with PDD.

From
Mahesh Pandya
Environmental Engineer
Paryavaran mitra
502, Raj Avenue, Bhaikakanagar road
Thaltej, Ahmedabad – 380059 India
Telefax - 079-26851321/1801
Submitted by: paryavaranmitra

o	Please explain additionality criteria in detail.
o	How many skilled/unskilled people from surrounding area were employed at this project during commissioning and operation as mentioned in social well being section? Also how many houses can get benefited from total 35 MW of electricity being outsourced to state grid due to this CDM project?
o	List of stakeholders and minutes of stakeholder meeting is not attached with PDD.

From
Mahesh Pandya
Environmental Engineer
Paryavaran mitra
502, Raj Avenue, Bhaikakanagar road
Thaltej, Ahmedabad – 380059 India
Telefax - 079-26851321/1801
Submitted by: paryavaranmitra

Gujarat forum on CDM respectfully submit the following comments on the Project Design Document (PDD) for Introduction of a new Gas Turbine based combined heat and power (CHP) plant with Natural Gas fuel, in existing CHP facilities with grid connectivity at fertilizer complex of KRIBHCO at Hazira in the state of Gujarat of India at Hazira, District Surat in Gujarat, India.

 

1.       Additionality

Clarify the additionality criteria for the project.

 

2.       Employment

 How many skilled/unskilled people from surrounding area were employed at this project during commissioning and operation as mentioned in social well being section?

 

3.       Benefit to local people

How many houses can get benefited from total 35 MW of electricity being outsourced to state grid due to this CDM project?

 

4.       Local stakeholder consultation

List of participants of meeting is not mentioned in PDD.

 

5.       Section F – Approval & Authorization

No detail provided in this section.

 

 

Falguni Joshi

Gujarat forum On CDM (Email – gujaratforumoncdm@gmail.com)

(Gujarat Forum on CDM – is a network of Individuals & Organisations working on Environmental issue & Monitoring of CDM projects in Gujarat, India.)
Submitted by: Gujarat Forum on CDM


The comment period is over.
* Emission reductions in metric tonnes of CO2 equivalent per annum that are based on the estimates provided by the project participants in unvalidated PDDs