Methane avoidance project at Colony Sugar Mills Ltd.
[]
Host party(ies) Pakistan
Methodology(ies) AMS-III.H. ver. 14
Standardised Baselines N/A
Estimated annual reductions* 61,015
Start date of first crediting period. 01 Jul 10
Length of first crediting period. 7 years
DOE/AE TÜV NORD CERT GmbH
Period for comments 08 May 10 - 06 Jun 10
PP(s) for which DOE have a contractual obligation Masefield Carbon Resources SA
The operational/applicant entity working on this project has decided to make the Project Design Document (PDD) publicly available directly on the UNFCCC CDM website.
PDD PDD (1294 KB)
Local stakeholder consultation report: N/A
Impact assessment summary: N/A
Submission of comments to the DOE/AE Compilation of submitted inputs:
1. The project activity uses Type III methodology, AMS III - H. Under the applicability criteria, "Measures are limited to those that result in aggregate emission reductions of less than or equal to 60 kt CO2
 equivalent annually from all Type III components of the project activity" has not been fulfilled in the present project activity.
2) The DOE needs to ensure that the annual emission reduction does not exceed 60kt CO2e in any year throughout the crediting period, if the PP wishes to use simplified M & P for SSC project activities.
3) If this criteria cannot be met, the DOE needs to ensure that a different methodology (Large scale, ACM0001 may be used.
Submitted by: Aditi Kulkarni


The comment period is over.
* Emission reductions in metric tonnes of CO2 equivalent per annum that are based on the estimates provided by the project participants in unvalidated PDDs