Luxi Nanmahe II 4MW Small Hydro Power Project
[]
Host party(ies) China
Methodology(ies) AMS-I.D. ver. 16
Standardised Baselines N/A
Estimated annual reductions* 13,095
Start date of first crediting period. 01 Jun 11
Length of first crediting period. 7 years
DOE/AE JCI
Period for comments 23 Oct 10 - 21 Nov 10
PP(s) for which DOE have a contractual obligation Climate Bridge Ltd.
The operational/applicant entity working on this project has decided to make the Project Design Document (PDD) publicly available directly on the UNFCCC CDM website.
PDD PDD (515 KB)
Local stakeholder consultation report: N/A
Impact assessment summary: N/A
Submission of comments to the DOE/AE Compilation of submitted inputs:
According to the IRR simplified formula in Appendix A of SL 16-95, which is applied for small scale hydro projects with installed capacity below 6 MW, IRR is 10.7% without CER revenues for this project. It should be noticed that no sales tax is applicable to hydro projects.
Submitted by: shuidian


The comment period is over.
* Emission reductions in metric tonnes of CO2 equivalent per annum that are based on the estimates provided by the project participants in unvalidated PDDs