10 MW Biomass based Power Plant at Narsimhapur, Madhya Pradesh
[]
Host party(ies) India
Methodology(ies) AMS-I.D. ver. 16
Standardised Baselines N/A
Estimated annual reductions* 52,979
Start date of first crediting period. 01 Jan 11
Length of first crediting period. 10 years
DOE/AE LRQA Ltd
Period for comments 29 Oct 10 - 27 Nov 10
PP(s) for which DOE have a contractual obligation Orient Green Power Company Ltd.
The operational/applicant entity working on this project has decided to make the Project Design Document (PDD) publicly available directly on the UNFCCC CDM website.
PDD PDD (473 KB)
Local stakeholder consultation report: N/A
Impact assessment summary: N/A
Submission of comments to the DOE/AE Compilation of submitted inputs:
Comment (23 KB) Submitted by:

Financial Analysis
The project proponent recently subscribed with ‘Initial Public Offer’ to raise equity funds for the subject project and as per document, SEBI prospectus http://www.sebi.gov.in/dp/orientgreendrhp.pdf; following needs to be considered: 
1.	As mentioned in the SEBI prospectus (page number 140) project owner stated the benefits of claiming RECs in the next years, which is accounting to 3.78 Indian rupees (Pg# 129 of prospectus). 
2.	As mentioned in the SEBI prospectus (page number 176), the possibility of en-cashing RECs after 2012, in case of CDM regime non existence after 2012. 
3.	If the same is accounted with the project financial IRR would be above the benchmark as the REC based revenue will be three fold compared to the carbon revenue
Project owner as committed with the SEBI prospectus for company operation, RECs are mandatory for the project operation, hence this part of revenue could be considered in the financial analysis. 
PDD
1.	Project, tariff price is not mentioned clearly in the PDD and sale will be to third party. 
2.	T&D related project emissions are not accounted thought “Tool to calculate project emissions from electricity consumption” is stated in the PDD
3.	Leakage due to biomass sourcing is missing
Submitted by: Ramesh Verma


The comment period is over.
* Emission reductions in metric tonnes of CO2 equivalent per annum that are based on the estimates provided by the project participants in unvalidated PDDs