Jongini Hydro Electric Power project in Himachal Pradesh, India
[]
Host party(ies) India
Methodology(ies) AMS-I.D. ver. 16
Standardised Baselines N/A
Estimated annual reductions* 39,690
Start date of first crediting period. 01 Apr 14
Length of first crediting period. 10 years
DOE/AE TÜV NORD CERT GmbH
Period for comments 11 Jan 11 - 09 Feb 11
PP(s) for which DOE have a contractual obligation Gangdari Hydro Power Private Limited
The operational/applicant entity working on this project has decided to make the Project Design Document (PDD) publicly available directly on the UNFCCC CDM website.
PDD PDD (574 KB)
Local stakeholder consultation report: N/A
Impact assessment summary: N/A
Submission of comments to the DOE/AE Compilation of submitted inputs:
•	When is the board meeting and date of investment decision? It is not explicitly mentioned in the PDD Why barrier analysis is not discussed in the PDD. If there is no barrier, then it should be mentioned in the PDD. 
•	PLF should be based on EB48 Annex 11guideline which says The plant load factor provided to banks and/or equity financiers while applying the project activity for project financing, or to the government while applying the project activity for implementation approval; (b) The plant load factor determined by a third party contracted by the project participants (e.g. an engineering company); But PDD doesn’t demonstrate how PLF has been arrived at. 
•	The PDD does not explain about identified training, monitoring and maintenance as per the Technology requirements for contractors / engineers by the client. There is no mention of field quality Assurance systems & procedures that are available at site, field quality plans and their approval
•	PDD does not clearly describe the stakeholders involved in Project or the information provided to them. The PDD mentions “identified stakeholders,” but no details which of these stakeholders actually participated in the process. The PDD does not describe the information provided to stakeholders with sufficient clarity, such as whether adverse environmental impacts were described along with the benefits that were mentioned.
Submitted by: Decosta


The comment period is over.
* Emission reductions in metric tonnes of CO2 equivalent per annum that are based on the estimates provided by the project participants in unvalidated PDDs