Biogas Utilization Project in Zhejiang Jingxing Paper Joint Stock Co. Ltd.
[]
Host party(ies) China
Methodology(ies) AMS-I.F.
AMS-III.H. ver. 15
Standardised Baselines N/A
Estimated annual reductions* 58,533
Start date of first crediting period. 01 Jan 11
Length of first crediting period. 10 years
DOE/AE TUEV-RHEIN
Period for comments 14 Sep 10 - 13 Oct 10
PP(s) for which DOE have a contractual obligation Zhejiang Jingxing Paper Joint Stock Co. Ltd.
Swiss Carbon Assets Ltd.
The operational/applicant entity working on this project has decided to make the Project Design Document (PDD) publicly available directly on the UNFCCC CDM website.
PDD PDD (6700 KB)
Local stakeholder consultation report: N/A
Impact assessment summary: N/A
Submission of comments to the DOE/AE Compilation of submitted inputs:
•	Firstly AMS III H doesn’t address the application of the AMS I F ver. 1 in the AMS III H which is the main methodology. Secondly the applicability criteria addressed in AMS I F doesn’t meet the applicability conditions stipulated in section B.2 of the project activity.
•	Section B.5 page 13 of the PDD – Prior CDM consideration of CDM – refers the PP has Feasibility Study Report (FSR) in place August 2008, however second methodology i.e. AMS I F version 1 has been applied in the project activity it’s a question mark. Moreover the validity of AMS I F version 1 is valid from 28 May 2010 which is very recent, so the FSR which has been prepared also subjected of its authenticity.
•	Page 14, Section B.5 of the PDD, paragraph 2 for proving addtionality refers the Attachment A to appendix B - investment barrier is applied in conjunction with Guidance on the Assessment of Investment Analysis (EB 51 annex 58) – Project proponent has argued the project addtionality on the basis of benchmark analysis i.e. sub-step 2 b   however project proponent required to follow the step 3 of the addtionality tool.
•	 
Submitted by: Pragya Kaushik


The comment period is over.