Efficiency Improvement by Boiler Rehabilitation in fossil fuel-fired (Natural Gas) Steam Boiler System
[]
Host party(ies) Saudi Arabia
Methodology(ies) AM0056
Standardised Baselines N/A
Estimated annual reductions* 41,831
Start date of first crediting period. 15 Jun 13
Length of first crediting period. 10 years
DOE/AE SGS-UKL
Period for comments 14 Dec 13 - 12 Jan 14
PP(s) for which DOE have a contractual obligation Al Jubail Fertilizer Company (Bayroni) a subsidiary of Saudi Basic Industries Corporation
The operational/applicant entity working on this project has decided to make the Project Design Document (PDD) publicly available directly on the UNFCCC CDM website.
PDD PDD (1903 KB)
Local stakeholder consultation report: N/A
Impact assessment summary: N/A
Submission of comments to the DOE/AE
The comment period is over.
No comments received.
* Emission reductions in metric tonnes of CO2 equivalent per annum that are based on the estimates provided by the project participants in unvalidated PDDs