INTERASEO LANDFILL GAS MITIGATION PROJECT
[]
Host party(ies) Colombia
Methodology(ies) ACM0001 ver. 13
Standardised Baselines N/A
Estimated annual reductions* 163,984
Start date of first crediting period. 30 Jan 13
Length of first crediting period. 7 years
DOE/AE DNV-CUK
Period for comments 26 May 12 - 24 Jun 12
PP(s) for which DOE have a contractual obligation INTERASEO S.A. E.S.P.
The operational/applicant entity working on this project has decided to make the Project Design Document (PDD) publicly available directly on the UNFCCC CDM website.
PDD PDD (1875 KB)
Local stakeholder consultation report: N/A
Impact assessment summary: N/A
Submission of comments to the DOE/AE Compilation of submitted inputs:
As ”Alternative 2: Capture and Clean Methane to Generate Electricity” generates income, I deem the simple cost analysis not as applicable. Besides, the investment cost for Alternative 2 according to Table 3 seem to be too low.
Submitted by: MDL Academico

As ”Alternative 2: Capture and Clean Methane to Generate Electricity” generates income, I deem the simple cost analysis not as applicable. Besides, the investment cost for Alternative 2 according to Table 3 seem to be too low.
Submitted by: MDL Academico


The comment period is over.
* Emission reductions in metric tonnes of CO2 equivalent per annum that are based on the estimates provided by the project participants in unvalidated PDDs