County An Cement 9MW Low Temperature Waste Heat Recovery Power Project
[]
Host party(ies) China
Methodology(ies) ACM0012 ver. 3
Standardised Baselines N/A
Estimated annual reductions* 44,424
Start date of first crediting period. 01 Jan 11
Length of first crediting period. 10 years
DOE/AE TUEV-RHEIN
Period for comments 25 Aug 10 - 23 Sep 10
PP(s) for which DOE have a contractual obligation An County Zhonglian Cement Co., Ltd.
CF Carbon Fund II Limited
The operational/applicant entity working on this project has decided to make the Project Design Document (PDD) publicly available directly on the UNFCCC CDM website.
PDD PDD (601 KB)
Local stakeholder consultation report: N/A
Impact assessment summary: N/A
Submission of comments to the DOE/AE Compilation of submitted inputs:
there are still lots of similar projects, WHR based power generation in a cement factory in Sichuan province, that the PDD developer failed to consider, such as
9MW waste heart recovery based power generation project by Sichuan Dujiangyan Cement Co., Ltd.
(Reference Website http://www.chinaheatpipe.cn/NEWS/new1716.html)
9MW waste heart recovery based power generation project by Beichuan Zhonglian Cement Co., Ltd.
(Reference Website http://www.hbcement.com/shownews.asp?news_id=1917)
4.5MW waste heart recovery based power generation project by Sichuan Zigong Fujiang Cement Co., Ltd.
(Reference Website http://www.gc10086.com/project_disp.php?p_id=1037)
4.5MW waste heart recovery based power generation project by Sichuan Panlong Huajian Cement Co., Ltd.
(Reference Website http://www.yc-bid.com/shownews.php?id=28253)
Submitted by: Greenensign


The comment period is over.
* Emission reductions in metric tonnes of CO2 equivalent per annum that are based on the estimates provided by the project participants in unvalidated PDDs