Clinker Optimization in cement types production at Derba MIDROC cement plant
[]
Host party(ies) Ethiopia
Methodology(ies) ACM0005 ver. 7
Standardised Baselines N/A
Estimated annual reductions* 418,236
Proposed start date of PA 14 Aug 09
Start date of first crediting period. 15 Nov 15
Length of first crediting period. 10 years
DOE/AE EPIC Sustainability Services Pvt. Ltd.
Period for comments 28 Oct 15 - 26 Nov 15 (23:59:59 GMT)
PP(s) for which DOE have a contractual obligation Derba MIDROC Cement PLC
Ethan Bio-Fuels PLC
The operational/applicant entity working on this project has decided to make the Project Design Document (PDD) publicly available directly on the UNFCCC CDM website.
PDD PDD (1559 KB)
Local stakeholder consultation report: N/A
Impact assessment summary: N/A
Submission of comments to the DOE/AE
The comment period is over.
No comments received.
* Emission reductions in metric tonnes of CO2 equivalent per annum that are based on the estimates provided by the project participants in unvalidated PDDs