Bundled Wind Power Project- EnKing International (CDM.Dec-10-01)
[]
Host party(ies) India
Methodology(ies) AMS-I.D. ver. 17
Standardised Baselines N/A
Estimated annual reductions* 15,844
Start date of first crediting period. 01 Dec 11
Length of first crediting period. 7 years
DOE/AE TÜV NORD CERT GmbH
Period for comments 05 Aug 11 - 03 Sep 11
PP(s) for which DOE have a contractual obligation EnKing International
The operational/applicant entity working on this project has decided to make the Project Design Document (PDD) publicly available directly on the UNFCCC CDM website.
PDD PDD (1401 KB)
Local stakeholder consultation report: N/A
Impact assessment summary: N/A
Submission of comments to the DOE/AE Compilation of submitted inputs:
It is not known how and why the DOE permits this consultant to web host the PDD without any information. Once again this PDD does not give any information on the input parameters and assumptions used. This is not conforming to CDM requirement where the reader should be in a position to construct the worksheet and arrive at the same results. Since no information is given, this requirement is not fulfilled. Hiding information only proves that the project is not additional and has been made additional. Otherwise there is no reason why the PP should hide information from global stakeholders. Therefore, this project should not be taken up for validation by DOE unless the PP re webhosts the PDD with all information. If the DOE goes ahead with validation without re webhosting, it will prove that it is also not aware of the rules. EB ma kindly note this proposal and do not accept it for registration unless it is re web hosted.
Submitted by: Karthikeyan


The comment period is over.
* Emission reductions in metric tonnes of CO2 equivalent per annum that are based on the estimates provided by the project participants in unvalidated PDDs