Construction and operation of the Hydraulic Power Plant Chicoasén II
[]
Host party(ies) Mexico
Methodology(ies) ACM0002 ver. 12
Standardised Baselines N/A
Estimated annual reductions* 299,436
Start date of first crediting period. 01 Jul 17
Length of first crediting period. 10 years
DOE/AE LGAI Technological Center, S.A.
Period for comments 09 May 12 - 07 Jun 12
PP(s) for which DOE have a contractual obligation Carbon Solutions de México S.A. de C.V. (Private)
The operational/applicant entity working on this project has decided to make the Project Design Document (PDD) publicly available directly on the UNFCCC CDM website.
PDD PDD (1133 KB)
Local stakeholder consultation report: N/A
Impact assessment summary: N/A
Submission of comments to the DOE/AE Compilation of submitted inputs:
Methodology has not been correctly applied in the PDD, Methodology states:

If the project activity is the installation of a new grid-connected renewable power plant/unit, the
baseline scenario is the following:

• Electricity delivered to the grid by the project activity would have otherwise been generated by the operation of grid-connected power plants and by the addition of new generation
sources, as reflected in the combined margin (CM) calculations described in the “Tool to calculate the emission factor for an electricity system”.

Methodology does not consider the installation of a fossil fuel power plant as an alternative.

Additionality is not demostrated in accordance with the applied mehtodology, which requires the use of the "“Tool for the demonstration and assessment of additionality”" (e.g. Common practice analysis shall be revised).

Submitted by: CDM_America


The comment period is over.
* Emission reductions in metric tonnes of CO2 equivalent per annum that are based on the estimates provided by the project participants in unvalidated PDDs