Danghe Upstream 3rd Cascade Hydropower Station Project
[]
Host party(ies) China
Methodology(ies) ACM0002 ver. 12
Standardised Baselines N/A
Estimated annual reductions* 66,799
Start date of first crediting period. 01 Jan 13
Length of first crediting period. 7 years
DOE/AE CEPREI certification body
Period for comments 19 Jan 12 - 17 Feb 12
PP(s) for which DOE have a contractual obligation Huaneng Subei Hydropower Development Co., Ltd.
The operational/applicant entity working on this project has decided to make the Project Design Document (PDD) publicly available directly on the UNFCCC CDM website.
PDD PDD (600 KB)
Local stakeholder consultation report: N/A
Impact assessment summary: N/A
Submission of comments to the DOE/AE
The comment period is over.
No comments received.
* Emission reductions in metric tonnes of CO2 equivalent per annum that are based on the estimates provided by the project participants in unvalidated PDDs