Bundled Wind Power Project by EKI Energy Services Limited (EKIESLCDM.January-14-01)
[]
Host party(ies) India
Methodology(ies) AMS-I.D. ver. 17
Standardised Baselines N/A
Estimated annual reductions* 21,205
Start date of first crediting period. 01 Sep 14
Length of first crediting period. 7 years
DOE/AE RINA Services S.p.A.
Period for comments 05 Apr 14 - 04 May 14
PP(s) for which DOE have a contractual obligation ReXchange Global Solutions (P70)
The operational/applicant entity working on this project has decided to make the Project Design Document (PDD) publicly available directly on the UNFCCC CDM website.
PDD PDD (292 KB)
Local stakeholder consultation report: N/A
Impact assessment summary: N/A
Submission of comments to the DOE/AE Compilation of submitted inputs:
1) In this project ReXchange Global Solutions (P70) is acting as PP. But email address of contact person is from EKI Energy which mean the project is belongs to EKI Energy Services only. In last few webhosting from EKI, we observed that Enking is involving new company for each project just to avoid debundling issue. DOE is requested to check the Incorporation Certificate and other necessary legal documents of incorporation of ReXchange Global Solutions (P70).  Further, in CDM project there is no regulation to protect the integrity of the system from such CDM consultant. Thus, we hope that this comment will go to project reviewer in UNFCCC and we also request to CDM-EB to take strong action in this kind of fake activity by this CDM consultant.  

2) In section A.2.4 of the PDD, PP has not mentioned the geo-coordinates for the Rajsriya Automotive industries (P) Ltd and Wel - Flow Engineering Co. Is it just to protect the WTGs from any GSC comments.  It also show the work culture of the DOE who webhosted the project without any prior checking.
  
3) As the WTGs are installed log back, thus, DOE is requested to check the geo-coordinates of all WTGs with GPS meter as the geo-coordinates of the WTGs may be changed to avoid debundling.  

4) It is surprised to see that PP has not mentioned any input parameters for calculating Equity IRR and the more surprising issue is additionality for Solar project has not mentioned at all. Then also DOE has webhosted the project!!!!!!. In this scenario, for any stakeholder it is difficult to check the IRR calculation. DOE is requested to re-webhost the PDD with all input parameters used in IRR calculation.

5) In this project, PP has considered the start date in 10/01/2008. Being an experienced in wind sector, it is well known that WTG supplier will take maximum 6 months from issuance of PO to commission of the WTG. Then why the project developer was silent for more than 6 years during golden period of CDM. PP has not mentioned the detailed chronology for this PDD also. DOE is requested to re-webhost the PDD with detailed chronology.

6) PP has intentionally not mentioned any dates of the main milestone in PDD (nether in chronology nor in section E.1 i.e. in stakeholders meeting part) which clearly shows PP wants to hide the facts in GSC. Thus, DoE is requested if they want to assess the project honestly, re-webhost the PDD with all missing document to enable us to have a look on the same.
  
7) PP has considered 21 years as the crediting period for the project. However, in section C.1.2, PP has mentioned that lifetime of the project is 20 years. If the operational lifetime of WTG is 20 years and out of that 6 years is already passed away, then how 21 years crediting period is justified. 
Submitted by: Climate Change Forum

Comment (8072 bytes) Submitted by: URS Verification Private Limited


The comment period is over.
* Emission reductions in metric tonnes of CO2 equivalent per annum that are based on the estimates provided by the project participants in unvalidated PDDs