Biogas Power Generation Project in Longganhu, Huanggang city, Hubei Province
[]
Host party(ies) China
Methodology(ies) AMS-III.D. ver. 18
AMS-I.D. ver. 17
Standardised Baselines N/A
Estimated annual reductions* 23,401
Start date of first crediting period. 01 Jan 13
Length of first crediting period. 7 years
DOE/AE TUEV-RHEIN
Period for comments 03 Nov 11 - 02 Dec 11
PP(s) for which DOE have a contractual obligation Hubei Huadian Longganhu Biogas Power Generation Co., Ltd.
UPM Umwelt-Projekt-Management GmbH
The operational/applicant entity working on this project has decided to make the Project Design Document (PDD) publicly available directly on the UNFCCC CDM website.
PDD PDD (1425 KB)
Local stakeholder consultation report: N/A
Impact assessment summary: N/A
Submission of comments to the DOE/AE Compilation of submitted inputs:
It is weird that the project leads to higher investment cost and lower power generation after design optimization (http://www.longganhu.gov.cn/html/jrlgh/lghyw/116.html). This is a cogeneration project. Further benefit from fertilizer production and cost saving from heat and electricity consumption for the farm due to the project implementation are not considered in financial analysis.
Submitted by: jia.wan


The comment period is over.
* Emission reductions in metric tonnes of CO2 equivalent per annum that are based on the estimates provided by the project participants in unvalidated PDDs