Recovery & utilization of associated gas from basement wells in the Kharir Field (Block 10),Yemen
[]
Host party(ies) Yemen
Methodology(ies) AM0009 ver. 4
Standardised Baselines N/A
Estimated annual reductions* 410,446
Start date of first crediting period. 01 Oct 10
Length of first crediting period. 10 years
DOE/AE SGS-UKL
Period for comments 20 Jan 10 - 18 Feb 10
PP(s) for which DOE have a contractual obligation Total Gas & Power Limited (“TGP”)
The operational/applicant entity working on this project has decided to make the Project Design Document (PDD) publicly available directly on the UNFCCC CDM website.
PDD PDD (808 KB)
Local stakeholder consultation report: N/A
Impact assessment summary: N/A
Submission of comments to the DOE/AE
The comment period is over.
No comments received.
* Emission reductions in metric tonnes of CO2 equivalent per annum that are based on the estimates provided by the project participants in unvalidated PDDs