Guizhou Beilei 8.4MW Hydro Power Project
[]
Host party(ies) China
Methodology(ies) AMS-I.D. ver. 16
Standardised Baselines N/A
Estimated annual reductions* 22,911
Start date of first crediting period. 01 Dec 10
Length of first crediting period. 7 years
DOE/AE Germanischer
Period for comments 01 Jul 10 - 30 Jul 10
PP(s) for which DOE have a contractual obligation Climate Bridge Ltd.
The operational/applicant entity working on this project has decided to make the Project Design Document (PDD) publicly available directly on the UNFCCC CDM website.
PDD PDD (545 KB)
Local stakeholder consultation report: N/A
Impact assessment summary: N/A
Submission of comments to the DOE/AE Compilation of submitted inputs:
The project was published with investment cost of 130 Million Yuan, double of the cost listed in PDD. Moreover, Power Density calculation is totally wrong.
Submitted by: shuidian


The comment period is over.