Grid Connected Wind Power Generation by Devendran Coal International Private Limited
[]
Host party(ies) India
Methodology(ies) AMS-I.D. ver. 17
Standardised Baselines N/A
Estimated annual reductions* 6,413
Start date of first crediting period. 01 Jun 12
Length of first crediting period. 10 years
DOE/AE LRQA Ltd
Period for comments 02 Nov 11 - 01 Dec 11
PP(s) for which DOE have a contractual obligation Devendran Coal International Private Limited. (Private Entity)
The operational/applicant entity working on this project has decided to make the Project Design Document (PDD) publicly available directly on the UNFCCC CDM website.
PDD PDD (293 KB)
Local stakeholder consultation report: N/A
Impact assessment summary: N/A
Submission of comments to the DOE/AE
The comment period is over.
No comments received.
* Emission reductions in metric tonnes of CO2 equivalent per annum that are based on the estimates provided by the project participants in unvalidated PDDs