DHCL Gas Turbine based Cogeneration Project
[]
Host party(ies) Pakistan
Methodology(ies) AMS-II.D. ver. 12
Standardised Baselines N/A
Estimated annual reductions* 31,112
Start date of first crediting period. 01 Sep 10
Length of first crediting period. 10 years
DOE/AE TÜV SÜD South Asia Private Limited
Period for comments 24 Mar 10 - 22 Apr 10
PP(s) for which DOE have a contractual obligation Dawood Hercules Chemicals Limited
The operational/applicant entity working on this project has decided to make the Project Design Document (PDD) publicly available directly on the UNFCCC CDM website.
PDD PDD (367 KB)
Local stakeholder consultation report: N/A
Impact assessment summary: N/A
Submission of comments to the DOE/AE
The comment period is over.
No comments received.
* Emission reductions in metric tonnes of CO2 equivalent per annum that are based on the estimates provided by the project participants in unvalidated PDDs