A Luoi Hydro Power Project
[]
Host party(ies) Viet Nam
Methodology(ies) ACM0002 ver. 12
Standardised Baselines N/A
Estimated annual reductions* 389,763
Start date of first crediting period. 01 Dec 12
Length of first crediting period. 7 years
DOE/AE JCI
Period for comments 06 Mar 12 - 04 Apr 12
PP(s) for which DOE have a contractual obligation Central Hydropower Joint Stock Company
Vattenfall Energy Trading Netherlands N.V.
The operational/applicant entity working on this project has decided to make the Project Design Document (PDD) publicly available directly on the UNFCCC CDM website.
PDD PDD (1108 KB)
Local stakeholder consultation report: N/A
Impact assessment summary: N/A
Submission of comments to the DOE/AE Compilation of submitted inputs:
As I know, the impacted people of this project are quite satisfied with compensation and resettlement plans of this project. Now they are living in a resettlement area with good houses, roads, electricity system, water supply system, irrigation system, health care system that are better than their previous living place.
Submitted by: Tim


The comment period is over.
* Emission reductions in metric tonnes of CO2 equivalent per annum that are based on the estimates provided by the project participants in unvalidated PDDs