“Celpa, Celtins and Cemat grid connection of isolated systems” (for simplicity hereafter referred to simply as rhe “Grupo Rede CDM Project”).
[]
Host party(ies) Brazil
Methodology(ies) AM0045
Standardised Baselines N/A
Estimated annual reductions* 53,273
Start date of first crediting period. 06 Jan 00
Length of first crediting period. 10 years
DOE/AE SGS-UKL
Period for comments 03 Jan 07 - 01 Feb 07
* Emission reductions in metric tonnes of CO2 equivalent per annum that are based on the estimates provided by the project participants in unvalidated PDDs

The content you see inside this frame is located outside the UNFCCC CDM Website. If you have problems viewing the content in the frame, click here to access the web site directly.
   
UNFCCC Secretariat assumes no responsibility for the third-party content linked through its website