Reforestation of Grazing Lands Hacienda El Manantial in Puerto Lopez, Colombia
[]
Host party(ies) Colombia
Methodology(ies) AR-ACM0003 ver. 2
Standardised Baselines N/A
Estimated annual reductions* 30,691
Proposed start date of PA 16 Jun 14
Start date of first crediting period. 16 Jun 14
Length of first crediting period. 30 years
DOE/AE TÜV SÜD South Asia Private Limited
Period for comments 01 Aug 15 - 14 Sep 15 (23:59:59 GMT)
PP(s) for which DOE have a contractual obligation Novartis Pharma AG
The operational/applicant entity working on this project has decided to make the Project Design Document (PDD) publicly available directly on the UNFCCC CDM website.
PDD PDD (4178 KB)
Local stakeholder consultation report: Local stakeholder consultation report (4178 KB)
Impact assessment summary: Impact assessment summary (4178 KB)
Submission of comments to the DOE/AE
The comment period is over.
No comments received.
* Emission reductions in metric tonnes of CO2 equivalent per annum that are based on the estimates provided by the project participants in unvalidated PDDs