Kilang Minyak Sawit Tg. Tualang Mill Wastewater Biogas Recovery and Utilisation Project
[]
Host party(ies) Malaysia
Methodology(ies) ACM0014 ver. 4
Standardised Baselines N/A
Estimated annual reductions* 80,411
Start date of first crediting period. 01 Jan 14
Length of first crediting period. 10 years
DOE/AE TUEV-RHEIN
Period for comments 21 Apr 12 - 20 May 12
PP(s) for which DOE have a contractual obligation Kilang Minyak Sawit Tg. Tualang (1997) Sdn. Bhd.
The operational/applicant entity working on this project has decided to make the Project Design Document (PDD) publicly available directly on the UNFCCC CDM website.
PDD PDD (1574 KB)
Local stakeholder consultation report: N/A
Impact assessment summary: N/A
Submission of comments to the DOE/AE
The comment period is over.
No comments received.
* Emission reductions in metric tonnes of CO2 equivalent per annum that are based on the estimates provided by the project participants in unvalidated PDDs