Genaveh Combined Cycle Power Plant
[]
Host party(ies) Iran (Islamic Republic of)
Methodology(ies) AM0029 ver. 3
Standardised Baselines N/A
Estimated annual reductions* 591,602
Start date of first crediting period. 01 Jan 13
Length of first crediting period. 10 years
DOE/AE SIRIM
Period for comments 25 Sep 12 - 24 Oct 12
PP(s) for which DOE have a contractual obligation MAPNA Genaveh Power Generation Co.
The operational/applicant entity working on this project has decided to make the Project Design Document (PDD) publicly available directly on the UNFCCC CDM website.
PDD PDD (1459 KB)
Local stakeholder consultation report: N/A
Impact assessment summary: N/A
Submission of comments to the DOE/AE
The comment period is over.
No comments received.
* Emission reductions in metric tonnes of CO2 equivalent per annum that are based on the estimates provided by the project participants in unvalidated PDDs