Ventana, Suba and Usaquen hydroelectric CDM bundled project
[]
Host party(ies) Colombia
Methodology(ies) AMS-I.D. ver. 17
Standardised Baselines N/A
Estimated annual reductions* 29,544
Start date of first crediting period. 01 Jul 12
Length of first crediting period. 7 years
DOE/AE Colombian Institute for Technical Standards and Certification
Period for comments 09 Mar 12 - 07 Apr 12
PP(s) for which DOE have a contractual obligation Empresa de Acueducto y Alcantarillado de Bogotá, EAAB.
The operational/applicant entity working on this project has decided to make the Project Design Document (PDD) publicly available directly on the UNFCCC CDM website.
PDD PDD (1587 KB)
Local stakeholder consultation report: N/A
Impact assessment summary: N/A
Submission of comments to the DOE/AE Compilation of submitted inputs:
Colombia has stated that Dispatch Data Analysis (DDA)is the methodology to follow for calculating grid emissions factor. Why this PDD dismiss DDA methodology?
Submitted by: Juan-Carlos Caycedo-Gonzales


The comment period is over.
* Emission reductions in metric tonnes of CO2 equivalent per annum that are based on the estimates provided by the project participants in unvalidated PDDs