ZOOMLION GHANA LTD Composting of Municipal Solid Waste in Accra area
[]
Host party(ies) Ghana
Methodology(ies) AM0025 ver. 12
Standardised Baselines N/A
Estimated annual reductions* 56,032
Start date of first crediting period. 01 Jan 12
Length of first crediting period. 7 years
DOE/AE JCI
Period for comments 08 Mar 11 - 06 Apr 11
PP(s) for which DOE have a contractual obligation Standard Bank Plc
The operational/applicant entity working on this project has decided to make the Project Design Document (PDD) publicly available directly on the UNFCCC CDM website.
PDD PDD (3957 KB)
Local stakeholder consultation report: N/A
Impact assessment summary: N/A
Submission of comments to the DOE/AE Compilation of submitted inputs:
Comment (36 KB) submitted by: Rosemary Olive Mbone Enie on behalf of Rosemary Olive Mbone Enie, International Coordinator, Pan African Climate Education (PACE) Centre Ghana

Comment (95 KB) submitted by: Mariel Vilella on behalf of GAIA - Global Alliance for Incinerator Alternatives and Pan African Climate Education (PACE) Centre Ghana


The comment period is over.
* Emission reductions in metric tonnes of CO2 equivalent per annum that are based on the estimates provided by the project participants in unvalidated PDDs