Kirkoswald Small Scale Hydro Power CDM Project in Sri Lanka
[]
Host party(ies) Sri Lanka
Methodology(ies) AMS-I.D. ver. 17
Standardised Baselines N/A
Estimated annual reductions* 9,244
Start date of first crediting period. 01 Jan 14
Length of first crediting period. 7 years
DOE/AE Bureau Veritas India Pvt. Ltd.
Period for comments 02 Mar 13 - 31 Mar 13
PP(s) for which DOE have a contractual obligation Bogo Power (Private) Limited
The operational/applicant entity working on this project has decided to make the Project Design Document (PDD) publicly available directly on the UNFCCC CDM website.
PDD PDD (1176 KB)
Local stakeholder consultation report: N/A
Impact assessment summary: N/A
Submission of comments to the DOE/AE
The comment period is over.
No comments received.
* Emission reductions in metric tonnes of CO2 equivalent per annum that are based on the estimates provided by the project participants in unvalidated PDDs