Mahan Small Hydro Electric Project Scheme-III, Chattisgarh State, India
[]
Host party(ies) India
Methodology(ies) ACM0002 ver. 12
Standardised Baselines N/A
Estimated annual reductions* 69,925
Start date of first crediting period. 01 Aug 12
Length of first crediting period. 10 years
DOE/AE TUEV-RHEIN
Period for comments 29 Apr 12 - 28 May 12
PP(s) for which DOE have a contractual obligation Venika Hydro Projects Private Limited
The operational/applicant entity working on this project has decided to make the Project Design Document (PDD) publicly available directly on the UNFCCC CDM website.
PDD PDD (388 KB)
Local stakeholder consultation report: N/A
Impact assessment summary: N/A
Submission of comments to the DOE/AE Compilation of submitted inputs:
Comment (601 KB) submitted by: sandrp on behalf of Samantha Agarwal, SANDRP

Comment (471 KB) submitted by: sandrp on behalf of Samantha Agarwal


The comment period is over.
* Emission reductions in metric tonnes of CO2 equivalent per annum that are based on the estimates provided by the project participants in unvalidated PDDs