“Feed switchover from Naphtha to Natural Gas at Phulpur plant of IFFCO” at Phulpur, Allahabad, Uttar Pradesh by M/s Indian Farmers Fertiliser Cooperative Ltd. (IFFCO)
[]
Host party(ies) India
Methodology(ies) AM0050 ver. 2
Standardised Baselines N/A
Estimated annual reductions* 350,252
Start date of first crediting period. 15 Sep 12
Length of first crediting period. 10 years
DOE/AE SGS-UKL
Period for comments 14 Jan 12 - 12 Feb 12
PP(s) for which DOE have a contractual obligation Indian Farmers Fertiliser Cooperative Ltd. (IFFCO)
The operational/applicant entity working on this project has decided to make the Project Design Document (PDD) publicly available directly on the UNFCCC CDM website.
PDD PDD (590 KB)
Local stakeholder consultation report: N/A
Impact assessment summary: N/A
Submission of comments to the DOE/AE
The comment period is over.
No comments received.
* Emission reductions in metric tonnes of CO2 equivalent per annum that are based on the estimates provided by the project participants in unvalidated PDDs