Sichuan Huadian Xixi River Hydro-electricity Development Co., Ltd. Luogu Hydroelectric Project
[]
Host party(ies) China
Methodology(ies) ACM0002 ver. 11
Standardised Baselines N/A
Estimated annual reductions* 388,867
Start date of first crediting period. 01 Jan 11
Length of first crediting period. 7 years
DOE/AE LRQA Ltd
Period for comments 08 May 10 - 06 Jun 10
PP(s) for which DOE have a contractual obligation EcoSecurities International Limited
The operational/applicant entity working on this project has decided to make the Project Design Document (PDD) publicly available directly on the UNFCCC CDM website.
PDD PDD (1101 KB)
Local stakeholder consultation report: N/A
Impact assessment summary: N/A
Submission of comments to the DOE/AE Compilation of submitted inputs:
The list in common practice is incomplete. Some referred info is not convincing.
Submitted by: shuidian


The comment period is over.
* Emission reductions in metric tonnes of CO2 equivalent per annum that are based on the estimates provided by the project participants in unvalidated PDDs