Mode-Shift of Goods from Bharathi Cement Plant, India
[]
Host party(ies) India
Methodology(ies) AM0090
Standardised Baselines N/A
Estimated annual reductions* 136,477
Start date of first crediting period. 01 Jan 12
Length of first crediting period. 10 years
DOE/AE SQS
Period for comments 13 Jul 11 - 11 Aug 11
PP(s) for which DOE have a contractual obligation Grütter Consulting AG
The operational/applicant entity working on this project has decided to make the Project Design Document (PDD) publicly available directly on the UNFCCC CDM website.
PDD PDD (724 KB)
Local stakeholder consultation report: N/A
Impact assessment summary: N/A
Submission of comments to the DOE/AE Compilation of submitted inputs:
The common practice presented in the PDD is not in accordance with the Additionality tool.
This does not describe how similar activities has been considered. PP has wrongly compared the data related to general freight in India. PP should compare this activity with other similar activities, like all the cement plants, power plants, steel plants (Bulk consumers of coal non-packaged raw material) in India.

I have working experience in cement sector and know that transportation through rail is commonly done for this sector considering the bulk of raw material is handled.

If there are any clarifications required by the DOE/PP, I'm available at jainankush.jain@gmail.com
Submitted by: Ankush Jain

Is it possible to construct a worksheet with the given information and arrive at the same results? How did the DOE webhost this PDD without even looking into the minimum requirements? This project should be re-webhosted with all information. 

The IRR is given as -11%. Though the consultant has hidden the information on whether the IRR goes above the benchmark with CDM benefits, with -11% pre CDM IRR it is not likely. Which project developer will invest in such projects? Is the project really additional? 
Submitted by: Karthikeyan


The comment period is over.
* Emission reductions in metric tonnes of CO2 equivalent per annum that are based on the estimates provided by the project participants in unvalidated PDDs