Wampu Hydro Electric Power Project
[]
Host party(ies) Indonesia
Methodology(ies) ACM0002 ver. 12
Standardised Baselines N/A
Estimated annual reductions* 241,634
Start date of first crediting period. 01 May 13
Length of first crediting period. 7 years
DOE/AE LRQA Ltd
Period for comments 02 Nov 10 - 01 Dec 10
PP(s) for which DOE have a contractual obligation PT. Wampu Electric Power
The operational/applicant entity working on this project has decided to make the Project Design Document (PDD) publicly available directly on the UNFCCC CDM website.
PDD PDD (565 KB)
Local stakeholder consultation report: N/A
Impact assessment summary: N/A
Submission of comments to the DOE/AE
The comment period is over.
No comments received.
* Emission reductions in metric tonnes of CO2 equivalent per annum that are based on the estimates provided by the project participants in unvalidated PDDs